Client: Elektrorazpredelenie Yug EAD (EVN)
Engineering and electrical design of external MV power supply, installation 250kVA, laying a 20kV cable in hard-to-reach areas with a total length of 5.4km.
Duration of construction works: 2 months.
Year of completion: 09-11.2011
Amount: 115,000 BGN